We start with how your site uses electricity, then work through feasibility, engineering, commercial structure, delivery and ongoing performance.

Green Grid Australia energy planning process
The process

A disciplined path from opportunity to delivery.

The goal is to avoid designing a technology solution before we understand the commercial and operational problem it needs to solve.

01

Energy data

Review interval data, electricity bills, tariffs, operating hours, peak demand and critical loads.

02

Feasibility

Assess roof or land, connection constraints, solar potential, storage duration and commercial viability.

03

Design & commercial

Develop the technical architecture and compare ownership, PPA or other commercial structures.

04

Delivery & operation

Progress engineering, approvals, construction, commissioning, monitoring and ongoing support.

What we assess

Technical and commercial decisions are made together.

A technically impressive system is not enough. We test whether the system matches the site’s load, tariff structure, resilience requirements, investment horizon and operational constraints.

Interval load profile
Peak demand & tariffs
Roof / land availability
DNSP connection constraints
Storage duration
Critical load requirements
CapEx vs PPA structure
ESG / emissions outcomes
Commercial energy system assessment
Solar and vanadium energy storage design
System design

Solar, storage and controls are designed as one system.

Where long-duration storage adds value, we size power and energy around the actual use case rather than forcing the site into a standard battery duration. Vanadium flow technology can be particularly useful where several hours of stored energy and frequent cycling are required.

Delivery philosophy

Build around operations, not around a construction schedule.

Commercial and industrial sites cannot simply stop operating. Delivery planning considers outage windows, safety, grid compliance, commissioning sequence and how the new system integrates with existing infrastructure.